Service · Outdoor
Landscaping
We start by measuring your garden on site and drawing a layout plan, then carry the whole job through ourselves: ground preparation, turf, planting, automatic irrigation and garden lighting.

Garden Design
A well-kept garden is the first thing a visitor reads about a home.
What We Do
From below the soil up to the lighting, in the right order.
What you see in a garden is the planting; how many years it lasts is decided by the drainage, soil preparation and irrigation line underneath. Get that order wrong and the garden is rebuilt within a few seasons.
- Garden survey and layout plan (green area, walkway, seating)
- Ground levelling, drainage and topsoil laying
- Roll turf or seeded lawn
- Trees, shrubs and seasonal planting
- Automatic irrigation (sprinkler and drip lines)
- Natural stone, paving stone and tiled walkways
- Garden lighting: path fixtures and plant spotlights
- Mowing, pruning and seasonal maintenance
Process
Three steps from bare ground to a garden that looks cared for.
Survey & Plan
We measure the garden on site and talk through how many hours of sun it gets, what the soil is like and how you want to use the space, then draw the layout plan.
Groundwork
Levelling, drainage and irrigation lines happen at this stage. It is the part nobody sees and the part that decides how long the garden lasts, so it is finished before any planting.
Planting & Handover
Turf goes down, plants are set, walkways and lighting are completed. At handover we go through the irrigation schedule and the first season of care together.
Where We Work
Wherever you are in Kemalpasa and around it, we come to you.
Our shop is in the Sekiz Eylul neighbourhood of Kemalpasa. We work across a wide area: the central neighbourhoods, the surrounding towns and the neighbouring districts.
FAQ
Answers before you ask.
When is the best season to lay turf?
Spring and autumn are the easiest windows, as roots establish faster in those months. In the Aegean climate summer laying is possible too, but the watering routine has to be followed far more closely. We set the timing together after the survey.
Should I choose roll turf or seed?
Roll turf gives you a green garden the day it is laid and protects against erosion immediately, at a higher cost. Seed is more economical but takes a season to fill in and needs weed control in the early months. We recommend based on how soon you need to use the garden.
Do I really need automatic irrigation?
In a small garden, watering by hand can be enough. As the lawn area grows, watering evenly and regularly by hand becomes very hard; an automatic system keeps water use under control and stops the lawn drying out in patches. The irrigation line is laid before the turf goes down.
How long does a landscaping project take?
For a mid-sized villa garden, groundwork and installation usually take one to three weeks. The timeline depends on the size of the area, whether drainage is needed and how much extra work such as stone walkways is involved. We give a firm figure after the survey.