All Guides

Guide · Permissions

Do You Need Permission to Renovate?

Permission for renovation splits into two separate subjects: official approvals about the structure, and neighbourly rules about the building. Work carried out inside a flat that does not touch the structural system (bathroom, kitchen, painting, flooring) generally needs no official permission. Anything affecting the structural system is an entirely different matter and calls for professional assessment.

Last updated: 27 July 2026

Which works need no permission?

Work that stays inside the flat and does not touch the load-bearing structure generally needs no official permission: renewing a bathroom or kitchen, painting, changing floor coverings, fitted furniture and lighting layouts.

Work that changes the facade, encloses new space or interferes with a load-bearing wall is assessed separately. The boundary is not always obvious, so where you are unsure, ask your municipality.

Can a load-bearing wall be altered?

Load-bearing walls, columns and shear walls carry the weight of the building, so altering them concerns the safety of the whole building rather than one flat. Changes of this kind should not be made without expert assessment and the necessary approvals.

A contractor saying "we can take this out, it will be fine" is not enough. Given that this is an earthquake region, it is worth being insistent here: if there is any doubt, stop before the wall is opened.

At MOSTAR we do not take on work involving the structural system on our own initiative, and we do not intervene without the necessary assessment.

Should the building management be informed?

Even where interior work needs no permission, informing the management is both courteous and practical. Working hours, use of the lift and rules on removing debris vary from building to building.

A renovation discussed in advance lets neighbours prepare for the noise and keeps the work from being halted by complaints. If the water riser will be isolated, that information must be shared beforehand.

Can a tenant commission a renovation?

A tenant making permanent changes to a rented property depends on the owner's consent. Reversible work such as painting is rarely an issue, while permanent changes to plumbing, finishes or partitions should not go ahead without written approval.

In practice the healthiest route is to put the scope of the work and the sharing of costs in writing. A verbal understanding tends to become a subject the two sides remember differently when it is time to move out.

Because this can have legal consequences, it is sensible to consult a legal adviser for substantial works.

Need help with this? Surveys and quotations are free in Kemalpasa and the surrounding area. Tell us about your project and we will plan the right approach together.

Related Services

We carry out the work in this guide.

FAQ

Answers before you ask.

Are there time limits for noisy work?

Most buildings set working hours in their own management rules, and local regulations may apply as well. The right approach is to learn your building's rules and plan the work around them. We ask for this information before starting.

Can I move the kitchen to a different position?

It may be technically possible, but it depends on the services: it can be done if clean water, waste and ventilation can be taken to the new position. This is a bigger job than a standard kitchen renewal and needs separate assessment at the survey.

Can I take the balcony into the room?

This changes the enclosed area and usually the facade, and it has consequences for insulation and structural safety. Consult your municipality and your building management before any such work; the decision has to be based on the specific situation of your own building.