What Should You Do Before a Renovation Starts?

Whether a renovation runs smoothly is largely decided before the first day. Material choices left unfinished, belongings left in place and a scope that was never written down. Most of the delays that happen mid-job come from these three.

Last updated: 27 July 2026

Put the scope and the quotation in writing

Before work starts, the list of works, the quality of materials, the estimated duration and the payment schedule should all be written down. What falls outside the scope should be stated just as clearly.

This is about clarity rather than mistrust. A written scope removes the sentence "I thought that was included" before it can be said, and protects both sides.

Finish choosing materials before day one

Tiles, sanitaryware, units, worktops and taps should all be settled before work begins. A change of choice during the work affects measurements and groundwork, which creates delay and extra cost.

Items that determine dimensions in particular, such as shower trays, bathtubs, built-in appliances and unit modules, must be fixed in advance. They dictate the wall and plumbing layout directly.

Prepare the home and the neighbours

Belongings in the work area should be moved out beforehand, and anything that cannot be moved should be covered. Fragile items and electronics belong well away from the work.

If you live in an apartment building, tell the management and your closest neighbours in advance, and share the working hours and expected duration. This small step prevents the most common disruption of all, work stopped by a complaint.

If you have pets, make a separate plan for the noisy days. Breaking days are demanding in both sound and dust.

What to ask of the contractor

Settle these before work starts, daily working hours, how often debris will be removed, how communal areas will be protected, at which stage the water or electricity will be cut, and the standard of cleanliness at handover.

Also ask which works carry a guarantee and how to reach them if something goes wrong. A contractor who answers that question clearly is one who will still be reachable after the job is finished.

Take photographs and keep records

Photograph the existing condition before work starts, and record the stages where the pipework and the insides of walls are exposed.

These records pay off later, knowing where a pipe runs before drilling a wall years afterwards is far safer than guessing. You can ask your contractor for photographs of those stages too.

Can you live in the property during the work?

The answer depends on the scope. Where one room is being renewed, staying is usually possible. In a full flat renovation it is not practical, because the wiring, the water and the flooring all come out in the same period.

The question that decides it is whether there is an alternative to that room. In a home with two bathrooms life carries on while one is renovated. With a single bathroom, a plan is needed at least for the days the plumbing is open.

If you are staying, the working area and the living area have to be physically separated. Once that division is in place the rest of the home can be used more or less normally. Demolition days are still noisy, and planning them back to back makes the process easier.

How is dust kept under control?

Dust is the side effect people complain about most and it cannot be prevented entirely. How far it spreads, though, can be limited a great deal.

The first measure is a barrier across the doorway of the working area. Closing the door is not enough on its own, the opening is sheeted and taped at the edges. Dust travels through the few centimetres under a door and reaches the whole home.

The second is shutting down the ventilation. Air conditioning and heating systems draw dust in and carry it to other rooms. Keeping those off during demolition days and covering the vents makes a clear difference.

The third is protecting the route out. Protection laid along the corridor the materials and waste travel through saves the floor and reduces dust being walked through the home. Sweeping daily is the most effective habit for stopping it building up.

Which jobs should be grouped together?

Some costs in a renovation are independent of the work itself and are paid again each time. Waste removal, scheduling the team, moving materials and putting up scaffolding all fall into that group.

So if more than one room is being considered, grouping them into one period lowers the total. Having the bathroom and the kitchen done at separate times means paying those shared costs twice.

The same logic applies to flooring and painting. If the floor is being replaced, painting comes afterwards, because floor work marks the walls. Get the order wrong and freshly painted walls need touching up.

Replacing joinery belongs on the same list. If windows or doors are being renewed, that happens before the walls and finishes are completed. Joinery fitted after a renovation opens up a surface that has just been finished.

When should materials be ordered?

Materials fall into two groups. Items bought from stock, and items made to measure. The second group governs the schedule, because manufacture does not start until the order is placed.

For made to measure items the production time has to be counted on its own. uPVC joinery usually takes 7 to 10 days to produce, aluminium 10 to 15 days and a steel security door 7 to 15 days. Installation is mostly 1 to 2 days. In other words most of the calendar is in the workshop rather than on site.

With stock items the risk is different. If the chosen model runs out, something similar is bought and the colour may not match. That is why with tiles it is worth buying slightly more than needed, which also leaves a reserve for breakages and later repairs.

What changes in a rental property?

For a property being let or held as an investment the priorities differ from a home you live in. What matters here is letting quickly and needing little maintenance rather than personal taste.

That pushes towards neutral colours and durable surfaces. Dark and heavily textured choices look strong but do not suit every tenant, and when they wear you cannot find the same thing again. Standard materials that are easy to source also make later small repairs cheaper.

The second difference is how the budget is split. Renewing what is visible and leaving the services as they are looks like a saving in the short term, but a leak appearing after the tenant moves in produces both a repair bill and lost rent. Dealing with the hidden services first is the more economical route.

Need help with this? Surveys and quotations are free in Kemalpasa and the surrounding area. Tell us about your project and we will plan the right approach together.

FAQ

Frequently asked about interior renovation

When should a renovation start, and which season suits it?

Interior work can be done in any season. Facade, terrace and garden work depends on dry weather, and exterior work started in a wet period may need correcting later. If your scope covers both inside and outside, we plan the schedule around that.

How is payment handled?

The payment schedule is set according to the scope and written into the quotation. We would advise against paying everything up front or working without a plan. Payment tied to stages is healthier for both sides.

What should I check at handover?

Check these. Whether there are leaks in the plumbing, whether the drains run properly, whether doors and cupboard fronts close cleanly, whether the silicone and grout are neat, and whether the switches and sockets work. Point out anything missing at handover. That is the easiest moment to put it right.

Where do the contents go during the work?

Where one room is being renewed, the contents are usually gathered into another room and covered. In a full flat renovation the position changes and the contents need to come out. On larger jobs, setting one room aside as storage and leaving it until last is another approach that works. Breakable items, electronics and anything of a documentary nature should be moved out of the working area in every case. We plan this at the survey, because moving day is the first day of the job.

What should I look for when choosing a contractor?

Price on its own is not the measure. The first thing to look at is the scope of the quotation. Are the works itemised, is waste removal included, is it clear who buys the materials. The second is how the survey is handled, since a contractor who quotes without seeing the space will change that figure mid job. The third is the answer you get when you ask what could turn up unexpectedly. An honest list of possibilities is more trustworthy than being told nothing will. Finally, ask how to reach them after the work is finished.

Which season suits a renovation?

Interior work can be done in any season, since the inside is not affected by the weather. Facade, terrace, garden and insulation work depend on dry conditions. Exterior work started in a wet period may need correcting later, because the next stage goes on before the surface is fully dry. If your scope covers inside and outside together we build the schedule around that, putting interior work in the wet period and exterior work in the dry one.